RSIS Repository Open-access research from RSIS International journals

International Journal of Research and Innovation in Applied Science (IJRIAS)

Analysis of Critical Path Method (CPM) To Optimized Project Scheduling

byIlo Hammed Owolabi; Shoyanbo Moshood Olarewanju

Published February 14, 2026  •  Vol. 11, Issue 2, pp. 87–93Open Access
DOI: 10.51584/IJRIAS.2026.11020008

Abstract

Network analysis makes use of critical path method to effectively manage and execute projects. Every project must be properly planned, scheduled and its completion time accurately estimated. As a result critical path method (CPM) is useful tool in project management and scheduling. This study employed critical path method to estimate the duration of a project in a building construction project using a case study of KLM Building Firm. The research design adopted was analytical, as it was suitable for the nature of the work. Secondary data on project activities were obtained from the construction site and used for the analysis. The (TORA) software were used to run the analysis. The result shows that the CPM is high efficient in estimating project completion time. The initial completion time of 45 weeks were reduced to 31 weeks by applying the CPM techniques. Based on this findings, it is recommended that management adopt CPM for proper decision-making, as its helps to save labour cost, reduce project during and increase organizational productivity.

Keywords: Critical path, Project Management, Scheduling, Earliest, Events, Latest Events

JournalInternational Journal of Research and Innovation in Applied Science (IJRIAS)
ISSN2454-6194
Volume / IssueVolume 11, Issue 2
Pages87–93
Publication dateFebruary 14, 2026
DOI10.51584/IJRIAS.2026.11020008
PublisherRSIS International
LicenseOpen Access

How to cite this article

Ilo Hammed Owolabi, & Shoyanbo Moshood Olarewanju (2026). Analysis of Critical Path Method (CPM) To Optimized Project Scheduling. International Journal of Research and Innovation in Applied Science (IJRIAS), 11(2), 87-93. https://doi.org/10.51584/IJRIAS.2026.11020008

BibTeX

@article{Ilo2026,
  title   = {Analysis of Critical Path Method (CPM) To Optimized Project Scheduling},
  author  = {Ilo Hammed Owolabi and Shoyanbo Moshood Olarewanju},
  journal = {International Journal of Research and Innovation in Applied Science (IJRIAS)},
  volume  = {11},
  number  = {2},
  pages   = {87--93},
  year    = {2026},
  doi     = {10.51584/IJRIAS.2026.11020008},
  publisher = {RSIS International}
}